Renovation of a canal lock. The company "Umwelttechnik & Wasserbau" has been awarded the contract for the rehabilitation of the Wedtlenstedt lock, the entrance lock to the branch canal to Salzgitter (Niedersachsen). Among other things, the lock walls in the upper part will be renewed at a height of 3.5 metres. 

 

Over a total length of 450 metres, the weathered concrete surface will be removed by an ERC 600 rotator milling machine. The machine works on a CAT 315C equipped with two cameras. At least 35 centimetres of the old porous material will be removed. However, the milling depth must not exceed 38 centimetres in order to keep the costs for the material of the new surface as low as possible. 

 

Between 5 and 8 metres of lock wall can be removed per day, depending on the number of steel girders used.




Disclaimer

No two jobsites are alike.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.