ER 600 – Menzi Muck A 81

Penetrating walls

Application details

Description

For the installation of an additional turbine for the pumped storage power plant at the Wendefurth dam in the Harz Mountains, a breakthrough in the lock wall must be created. A task that is accomplished by an ER 600 with flying colours



Disclaimer

No two jobsites are alike.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.