An ER 600 L with a customized cutter drum widening over 5 kilometers of drainage channels as part of a large scale renovation project at Munich Airport.
Disclaimer
No two jobsites are alike.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.