ER 100 – Hitachi ZX 35

Renovation of a canal lock

Videos

0:00
|
Progress: 0%

Drum cutter ER 100-4 application video

Renovation of a canal lock

Loading...

Application details

Description

Renovation of the Lower Lock at point 1.7 km on the Landwehr Canal in Berlin

Vibration free removal of concrete
Production rates per hour: up to 5 m3
Round attack pick: ER 16/46/38/20 S



Disclaimer

No two jobsites are alike.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.