ER 1500 XL – Kato HD 820
Gravel production
Application details
Product | Excavator | Material | Location | Date |
---|---|---|---|---|
Kato HD820-3, 20 tons |
Weathered rock |
China |
2004 |
Description
An ER 1500-3 XL on a Kato HD 820 is cutting broken stone in Guangzhou, China. The production rate is 15–20 m3/hr.
Disclaimer
No two jobsites are alike.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.