An ER 2000 with OilQuick OQ 80 mounted on CAT 336 is used for trenching of foundation base plate at new construction building in Frankfurt, Germany. On top and bottom of foundation plate, 32 mm diameter rebars are installed. The rebar layers are broken out by a hydraulic hammer.
Disclaimer
No two jobsites are alike.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.