ER 2000 – CAT 345

Removal of salt waste heaps

Application details

Description

An ER 2000 used to for slope work near the A38 motorway between Göttingen and Halle (Saale).  The production rate was 40 m3/hr.



Disclaimer

No two jobsites are alike.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.