ER 1500 X – Volvo EC 290

Excavating under gas pipelines

Videos

0:00
|
Progress: 0%

Drum cutter ER 1500-3 X application video

Excavating under gas pipelines

Loading...

Application details

Description

An ER 1500-3 X achieves the completion of 12 m mini tunnel for water pipeline crossing under three parallel live gas pipelines in Doha, Qatar.



Disclaimer

No two jobsites are alike.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.