ER 1500 X – Volvo EC 290
Excavating under gas pipelines
Videos
Drum cutter ER 1500-3 X application video
Excavating under gas pipelines
Loading...
Application details
Product | Excavator | Material | Location | Date |
---|---|---|---|---|
Volvo EC290B LC, 29 tons |
Limestone |
Qatar |
2010 |
Description
An ER 1500-3 X achieves the completion of 12 m mini tunnel for water pipeline crossing under three parallel live gas pipelines in Doha, Qatar.
Disclaimer
No two jobsites are alike.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.
The productivity depends on the material characteristics or rock hardness, the settings and condition of the carrier unit, the technical and wear condition of the attachment and the operator skills, as well as a couple of other factors. The given figures can vary based on different conditions. We reserve the right to change technical data without further notice.